- Week
- Use the stable identifiers WEEK-01 through WEEK-04 and add a distinct planning purpose—constraint baseline, burden review, handoff design, or cycle review. M04-I02 (F02) and M04-I03 (F03) support the shared coverage and burden context; calendar dates remain not supplied. Do not encode an invented date, assignment, approval, or result in the identifier. Review: the people owner and country-qualified reviewer.
- Coverage deliverable
- Record the supplied ten-hour Mountain Time daily coverage request from M04-I02 (F02), then state the distinct planning purpose for that week. Mark covered functions, calendar dates, IANA zones, workload, and staffing not supplied. Never calculate local times or assign workers without date, location, availability, leave, and qualified working-time evidence. Keep the proposed coverage row pending for the people owner and country-qualified reviewer.
- Supported evidence
- Transcribe the smallest decision-relevant fact supported by the cited module input and preserve its supplied confidence or uncertainty for Supported evidence. Evidence: M04-I01 (F01), M04-I02 (F02), M04-I03 (F03); mark “Not supplied” when absent. Do not convert a report, allegation, estimate, or provisional statement into a verified fact. Escalate to the people owner and country-qualified reviewer.
- Source input ID
- Source input ID: List the exact module input ID beside every material statement, adding its fact ID when present. Cite M04-I01 (F01), M04-I02 (F02), M04-I03 (F03); if insufficient, mark “Not supplied” and name the missing citation trace. Do not cite the case brief as approval or cite an input that does not support the statement. Review: the people owner and country-qualified reviewer.
- Proposed burden rotation
- Describe a learner-proposed method for sharing unavoidable early or late work and reviewing burden over WEEK-01 through WEEK-04. Use M04-I03 (F03) as the supplied burden trigger and M04-I04 (F12) for unresolved country rules; mark worker-level data not supplied. Never assign a person or claim fairness/compliance without dates, locations, availability, leave, workload, and qualified review. Keep pending for the people owner.
- Asynchronous handoff
- Define the handoff contents—completed work, evidence links, open risks, next owner, decision needed, due time, and response expectation—and the approved schedule system still required. M04-I03 (F03) supports exploring an alternative to recurring late meetings; actual handoffs, timing, recording permission, and results are not supplied. Do not claim the protocol was used. Escalate to the people owner and country-qualified privacy reviewer.
- Location, date, holiday, or DST dependency
- Location, date, holiday, or DST dependency: State the exact absent record, decision, method, value, or authority; explain why it matters and the bounded next request. Cite M04-I02 (F02), M04-I03 (F03); if insufficient, mark “Not supplied” and name the missing gap discipline. Do not hide the gap in narrative, fill it with a placeholder value, or imply the request was answered. Review: the people owner and country-qualified reviewer.
- Working-time or privacy review
- Name the country-qualified reviewer and the exact schedule or privacy question: working-time limits, rest, leave/holiday, worker location and date, IANA zone, recording permission, access, retention, notice, or alternative. M04-I04 (F12) confirms country rules are unresolved; decisions remain not supplied. Never state compliance or permission from a country-level assumption. Keep pending for people/operations and qualified employment/privacy reviewers.
- Review gate
- Write a stop/go/escalate rule with its prerequisite, authorized decision role, evidence gate, and pending outcome for Review gate. Evidence: no direct “Design a fair rhythm” source fact; mark “Not supplied” when absent. Do not execute the control, commit funds, release work, or claim a decision occurred in this exercise. Escalate to the people owner and country-qualified reviewer.
- Exception
- Record the recurring late Mountain meeting from M04-I03 (F03) as an open burden exception, then identify the affected workers, exact dates/times, feasible alternatives, owner, duration, mitigation, and disposition that are not supplied. Do not call the exception approved, necessary, fair, or resolved without those records. Keep the schedule blocked where the exception affects assignment. Review: the people owner and country-qualified working-time/privacy reviewer.
- Status
- For Status, select a truthful state—draft, open, blocked, pending review, or not supplied—and tie it to the evidence still required. No “Design a fair rhythm” source fact supplies it; mark “Not supplied” and request the missing state control. Never mark complete, accepted, verified, distributed, or closed without the corresponding record. Keep pending for the people owner and country-qualified reviewer.