Procurement & Quality School · Learning track

Procurement Coordination

Coordinate purchasing decisions with comparable evidence and visible approvals.

Start Lesson 1

Your learning work, on this device

No signup, cloud storage, cross-device sync or verified completion. Saving is optional. This browser profile is shared with anyone who can use it; private mode, browser cleanup or storage limits may remove work. Use only fictional or non-sensitive material. Export a copy before relying on this device.

Not saved. Worksheets, answers and practice notes currently last only in this tab.

Practice markers are self-reported, never credentials.

01 Learning plan

Know the work.
Produce evidence.

Public foundation 2026.10.08-learning-paths-1 · published 2026-10-08. Independent subject-matter review is pending; paid delivery and credential issuance remain closed. This track is organized around inspectable work, not attendance alone.

Workload

No validated completion time is published. Read the six modules, then complete the six case assignments and self-review across as many sessions as needed. This release has not yet been timed with learners; no facilitated capstone is included.

Prerequisites

  • Comfort using spreadsheets, email, and shared document systems
  • Basic understanding of purchase requests, suppliers, and approvals
  • Access to a fictional or sanitized purchasing scenario; never upload confidential supplier data

Outputs

  • Approved procurement intake brief
  • Supplier field and due-diligence log
  • Controlled RFQ package and question register
  • Normalized total-cost comparison and recommendation
  • Approval, purchase-order, delivery, and supplier-performance record

Demonstrated outcomes

  • Turn a request into a complete procurement brief
  • Coordinate fair and comparable RFQs
  • Maintain approval and communication records
  • Track delivery, exceptions, and supplier performance

Working vocabulary

Requirement baseline
The approved description of quantity, specification, acceptance criteria, delivery need, commercial constraints, and permitted alternatives against which supplier responses are compared.
RFQ
A request for quotation that gives candidate suppliers a common scope, response format, deadline, and communication channel so offers can be compared fairly.
Landed cost
The expected cost to place an item at its required destination, including price, tooling, packaging, freight, insurance, duties, brokerage, and other known charges.
Incoterm
An ICC trade term that allocates specified delivery tasks, costs, and risks between seller and buyer; it does not replace the complete sales contract.
Segregation of duties
A control that separates requesting, sourcing, approving, receiving, and paying responsibilities so one person cannot complete and conceal an improper transaction.

02 Public foundation curriculum

Six foundation
learning modules.

Each module states what to understand, what to practice, what evidence to retain, and the criteria for moving forward. The case lab turns those standards into six realistic assignments.

01

Module 1

Procurement intake and requirement clarity

Objective: Convert an informal request into an approved, testable procurement baseline without inventing technical or commercial requirements.

Open Lesson 1: examples, worksheet & feedback →

A coordinator begins by clarifying the decision, not by asking suppliers for prices. Record the business need, requesting owner, quantity, delivery location and date, approved budget range, specification revision, acceptance evidence, and whether alternatives are permitted. Separate mandatory requirements from preferences. If a drawing, formulation, software scope, or regulated requirement is involved, identify the qualified technical owner who controls it. The coordinator can organize questions and versions but should not approve engineering, safety, legal, tax, or regulatory conclusions outside delegated authority.

Freeze the approved baseline before issuing the RFQ and assign it a version. Record assumptions, open questions, interfaces, packaging, warranty, service, installation, data, and documentation needs. A change after release must be logged, approved, and distributed to every participating supplier through the same channel. This prevents one bidder from pricing a richer or easier scope than another. A useful intake ends with a go, revise, or stop decision and preserves who approved what and when. Urgency is not permission to bypass the baseline or authorization limits.

Practice

Turn a two-sentence request for 500 custom assemblies into a one-page intake brief, then mark five questions that require technical-owner approval before release.

Evidence to keep

A versioned intake brief, question log, and approval record that contain no invented specifications.

Ready to move on when

  • The baseline distinguishes every mandatory requirement from preference or open question.
  • Quantity, location, required date, revision, acceptance evidence, budget authority, and owner are recorded.
  • Technical, legal, regulatory, or safety questions are assigned to qualified decision owners rather than answered by the coordinator.

Module provenance

External authorities, common professional practice, and Academy-selected controls are identified separately. A source supports only the stated scope; it does not convert this lesson into legal, licensed, accredited, or regulatory advice.

02

Module 2

Supplier field and conflict boundaries

Objective: Build a defensible supplier field while documenting conflicts, sanctions checks, capability evidence, and reasons for inclusion or exclusion.

Open Lesson 2: examples, worksheet & feedback →

Supplier discovery should produce a reasoned field, not a collection of search results. Define screening factors before researching: relevant process, capacity, location, certifications claimed, financial or continuity indicators, export or sanctions considerations, data-security needs, and ability to meet the baseline. Record each source and verification date. A website statement is a lead, not proof. Confirm legal name, operating address, ownership information available through approved channels, and whether certificates can be validated with the issuing body. High-risk jurisdictions, controlled technology, or government work require specialist review.

Conflicts and communications must be visible. A coordinator discloses personal, family, referral, gift, or financial relationships and follows the organization's recusal rule. Do not promise business, share a competitor's confidential price, or let one supplier privately rewrite the scope. Apply the same material information and deadline rules to all active bidders. Document why a supplier advanced, was paused, or was excluded using job-relevant evidence, not nationality, accent, stereotypes, or unsupported reputation. Procurement policy and applicable anti-bribery, sanctions, competition, and import rules control when they are stricter.

Practice

Screen six fictional suppliers against a published matrix, document one disclosed conflict, and route two unresolved compliance questions to the correct owner.

Evidence to keep

A dated supplier-field matrix with sources, decision reasons, conflict declarations, and escalation owners.

Ready to move on when

  • Every inclusion and exclusion maps to a predeclared, requirement-related factor.
  • Claims such as certification, capacity, and legal identity are labeled verified, unverified, or not applicable with a source date.
  • Conflicts and compliance uncertainties are disclosed and routed without sharing competitor-confidential information.

Module provenance

External authorities, common professional practice, and Academy-selected controls are identified separately. A source supports only the stated scope; it does not convert this lesson into legal, licensed, accredited, or regulatory advice.

03

Module 3

RFQ package and communication

Objective: Issue a controlled RFQ that gives qualified suppliers the same material information, response structure, and communication rules.

Open Lesson 3: examples, worksheet & feedback →

The RFQ package should make compliant response easier than improvisation. Include the baseline revision, quantities and breakpoints, delivery destination and schedule, requested Incoterm where cross-border trade is involved, required tooling and nonrecurring charges, quality evidence, packaging, warranty, payment proposal, quote-validity period, exclusions, and response deadline. State whether partial bids or alternatives are allowed and how they must be labeled. Include a response template so price, lead time, assumptions, and exceptions occupy comparable fields. Confidential information should be shared only through approved access controls and agreements.

Use one named channel for supplier questions and maintain a question-and-answer register. If an answer changes the interpretation or economics of the requirement, distribute it to all participating suppliers without identifying who asked. Log RFQ release, receipt acknowledgments, amendments, extensions, and submissions. Never coach a favored supplier toward another bidder's offer. Late-bid treatment and negotiation authority should follow written policy. Before closing, perform an administrative completeness check; do not silently repair a supplier's missing exception, signature, or price. Record clarification requests and responses as part of the decision file.

Practice

Prepare an RFQ cover sheet and response table, then process three supplier questions, including one answer that requires a controlled amendment to every bidder.

Evidence to keep

A complete RFQ package, distribution log, Q&A register, amendment notice, and receipt record.

Ready to move on when

  • All suppliers receive the same baseline, response fields, deadline, and material clarifications.
  • The package requests price, lead time, validity, terms, assumptions, exceptions, quality evidence, and logistics information.
  • Release, questions, amendments, submissions, and late or incomplete responses are time-stamped and retained.

Module provenance

External authorities, common professional practice, and Academy-selected controls are identified separately. A source supports only the stated scope; it does not convert this lesson into legal, licensed, accredited, or regulatory advice.

04

Module 4

Quotation normalization and total cost

Objective: Normalize commercial and operational differences so the decision compares equivalent scope, total expected cost, and material risk.

Open Lesson 4: examples, worksheet & feedback →

A low unit price is not necessarily the lowest-cost offer. First test compliance against the requirement baseline, then place each quote into common units, currency date, quantity tier, and delivery assumption. Separate recurring price from tooling, samples, engineering, minimum-order effects, packaging, inspection, freight, insurance, duties, brokerage, installation, subscriptions, and payment-financing effects. Record exclusions and buyer-supplied items. For international transactions, confirm the named place and Incoterm version; obtain specialist advice for customs classification, duty, tax, sanctions, and import obligations rather than guessing.

Present facts separately from estimates and judgment. Every normalized adjustment needs a formula, source, date, and owner. Build scenarios when freight, demand, exchange rates, yield, or lead time is uncertain, and show which assumptions can change the recommendation. Consider capacity, continuity, defect risk, warranty response, data security, and schedule impact alongside price, but do not hide subjective weighting. A recommendation should state the best-supported option, important tradeoffs, unresolved clarifications, and the approval required. Normalization does not authorize the coordinator to negotiate or award beyond delegated limits.

Practice

Normalize three fictional quotations quoted under different currencies, quantity tiers, freight responsibilities, tooling charges, and payment terms; run a 15 percent freight sensitivity.

Evidence to keep

A formula-visible comparison workbook with source notes, total-cost scenarios, compliance flags, and recommendation rationale.

Ready to move on when

  • All offers use a common scope, unit, currency date, quantity, destination, and time horizon.
  • Recurring, nonrecurring, logistics, payment, and uncertainty components are separately visible and traceable.
  • The recommendation identifies tradeoffs, sensitivities, unresolved items, and the authorized decision owner.

Module provenance

External authorities, common professional practice, and Academy-selected controls are identified separately. A source supports only the stated scope; it does not convert this lesson into legal, licensed, accredited, or regulatory advice.

05

Module 5

Approval, PO, and delivery coordination

Objective: Maintain the control chain from approved recommendation through purchase-order acknowledgment, delivery evidence, and exception escalation.

Open Lesson 5: examples, worksheet & feedback →

Before commitment, confirm that the recommendation, budget, supplier onboarding, required reviews, and approval limits are complete. The purchase order must reflect the approved supplier, item and revision, quantity, price, delivery, ship-to and bill-to details, terms, quality clauses, and referenced documents. Coordinators may prepare or route a PO, but only an authorized person releases it. Never treat a supplier quote, chat message, or internal request as authorization. Preserve the approval artifact and verify that the supplier's acknowledgment matches the issued order rather than assuming silence means acceptance.

Build the delivery tracker from contractual milestones: acknowledgment, material readiness, sample approval, production, inspection, shipment, customs if applicable, receipt, and acceptance. Ask for evidence appropriate to each milestone and record forecast versus actual dates. Escalate late delivery, quantity variance, damage, document mismatch, quality hold, or unauthorized substitution before changing the record. A coordinator should not instruct payment for disputed or unaccepted goods outside procedure. Close the order only when receipt, acceptance, exceptions, credits, and required documents reconcile, while retaining an audit trail of approved changes.

Practice

Route a fictional award through a three-level approval matrix, reconcile a changed supplier acknowledgment, and manage a delivery delay without altering the original PO history.

Evidence to keep

Approval packet, issued PO, acknowledgment reconciliation, milestone tracker, exception log, and closure checklist.

Ready to move on when

  • The released PO exactly reflects the approved commercial and technical baseline or contains approved changes.
  • Authorization, supplier acknowledgment, milestone evidence, receipt, acceptance, and exceptions are traceable.
  • No commitment, scope change, payment instruction, or closure occurs outside documented authority.

Module provenance

External authorities, common professional practice, and Academy-selected controls are identified separately. A source supports only the stated scope; it does not convert this lesson into legal, licensed, accredited, or regulatory advice.

06

Module 6

Performance records and continuous improvement

Objective: Use consistent delivery, quality, responsiveness, and commercial records to improve future sourcing decisions without turning anecdotes into ratings.

Open Lesson 6: examples, worksheet & feedback →

Supplier performance starts with operational definitions. On-time delivery needs a contractual date, accepted tolerance, and treatment of buyer-caused changes. Quality measures need an agreed unit, inspection basis, and disposition rule. Responsiveness should measure required actions and closure, not personality or time-zone convenience. Capture price or invoice variance, document completeness, corrective-action closure, and service events where relevant. Separate supplier-controlled results from approved changes, force majeure, buyer delay, or insufficient evidence. Give the supplier a chance to correct factual errors through the defined review process.

Use trends to decide actions, not to decorate a scorecard. A single severe event may require immediate containment, while small recurring misses may reveal a process problem. Define thresholds for recognition, development, increased inspection, corrective action, sourcing review, or exit, with responsible approvers. Record improvement actions, owners, dates, and effectiveness checks. Do not publish defamatory conclusions or use unverified allegations. Retention, privacy, antitrust, and contractual rules still apply. Continuous improvement means changing a requirement, communication, control, or supplier plan based on evidence and then checking whether the change worked.

Practice

Calculate a quarterly scorecard from a sanitized order history, challenge two misleading measurements, and propose one supplier action and one buyer-process correction.

Evidence to keep

A source-linked scorecard, factual-review log, improvement plan, and effectiveness-check schedule.

Ready to move on when

  • Each metric has a definition, source, owner, period, exclusion rule, and decision threshold.
  • Supplier-controlled results are separated from buyer-caused or unverified events.
  • Improvement and escalation actions have owners, due dates, authorization, and effectiveness checks.

Module provenance

External authorities, common professional practice, and Academy-selected controls are identified separately. A source supports only the stated scope; it does not convert this lesson into legal, licensed, accredited, or regulatory advice.

Procurement coordinator checking supplier and inventory records in a warehouse.
Learn the standard. Practice the work.
Warehouse professional verifying inventory information for a purchasing workflow.
Leave with evidence you can inspect.

Free operational lesson

Compare the same scope

Normalize quantity, specification, incoterm, packaging, tooling, freight, payment, lead time, warranty, exclusions, and validity before treating two supplier prices as comparable.

01

Baseline before outreach

Do not ask for price until the requirement, decision owner, permitted alternatives, and acceptance evidence are explicit and versioned.

02

Equal material information

Give active bidders the same controlled scope, deadlines, and material clarifications while protecting each supplier's confidential information.

03

Normalize with traceable formulas

Convert offers to comparable scope and total cost using visible calculations, dated sources, and identified assumptions.

04

Authority at every commitment

Separate preparation from approval and release; preserve who authorized supplier selection, order, change, exception, and closure.

05

Learn from controlled records

Measure defined supplier outcomes, correct factual errors, and connect improvement actions to owners and effectiveness checks.

Unscored self-reflection

Select each module standard that is already consistently true. This is a private reflection—not a test, grade, credential assessment, or claim of competence.

Your choices stay in this browser and are not submitted. Device-only saving is optional in the learning-work panel.

Worked example

A quote that looked 12 percent cheaper

Three suppliers quote an imported machined part. Supplier B appears cheapest per unit but excludes tooling, inspection, export packaging, and freight and requires a larger minimum order.

Weak approach

Choose Supplier B because its unit price is lowest and ask for approval using the quotation totals as submitted.

Stronger approach

Normalize all quotes to the approved annual quantity and destination, separate tooling and recurring costs, document Incoterm and named place, estimate only with sourced assumptions, run volume and freight scenarios, and show that Supplier A has the lower expected landed cost at the required quantity. Route customs and technical questions to qualified owners before approval.

Why it matters: Comparable evidence changes the decision. The coordinator adds value by exposing scope, cost, authority, and uncertainty—not by making unsupported technical or trade-compliance judgments.

03 Control the work

Spot failure.
Measure the system.

Common failure modes

Shopping before the requirement is approved

Early quotes anchor the team to incomparable assumptions and create rework. Treat exploratory pricing as nonbinding research and issue a controlled baseline before formal comparison.

Treating unit price as total cost

Tooling, freight, duties, minimum orders, payment timing, inspection, warranty, and schedule risk can reverse the apparent ranking.

Giving one supplier privileged clarification

Material answers must reach every active bidder through the controlled channel; competitor prices and confidential designs must never be disclosed.

Confusing coordination with authority

Preparing a recommendation, PO, or change does not authorize commitment. Approval limits and specialist boundaries remain in force under schedule pressure.

Operating measures

RFQ first-pass completeness

Percentage of issued RFQs that contain every required baseline, commercial, response, and approval field at initial release.

Use it to decide: If below target, stop measuring coordinator speed and repair intake guidance, ownership, or release review.

Comparable-bid rate

Percentage of received quotations that can be normalized without reopening a material scope question.

Use it to decide: A falling rate triggers review of RFQ clarity, Q&A handling, and supplier response templates.

On-time delivery to acknowledged date

Accepted deliveries on or before the supplier-acknowledged contractual date divided by due deliveries, with documented exclusion rules.

Use it to decide: Trend by supplier and cause; escalate severe misses and correct buyer-caused scheduling issues separately.

Exception closure aging

Median and oldest open days for commercial, delivery, document, or quality exceptions awaiting controlled closure.

Use it to decide: Use aging thresholds to escalate blocked decisions rather than allowing hidden backlog to become normal.

04 · Applied case lab · 2026.08.31-practice-3

Practice on a
messy record.

The packet contains contradiction and incomplete evidence on purpose. Each assignment now identifies the exact fictional inputs available to the learner. Complete a bounded starter, mark missing records instead of inventing them, and compare your reasoning with the debrief—not with a pretend single perfect answer.

This is a fictional, sanitized procurement training case. Organizations, suppliers, pricing, specifications, contacts, and records are fabricated, and the exercise is not legal, trade, engineering, tax, or supplier-approval advice.

CB01 · citable versioned case brief

SummitArc enclosure sourcing decision

SummitArc is a fictional maker of portable monitoring units preparing a 500-unit pilot. Engineering requests a powder-coated aluminum enclosure, drawing revision C, with two critical hole positions, outdoor use, and delivery to Provo in 11 weeks. The intake file does not state alloy temper, coating standard, salt-spray expectation, inspection method, packaging, approved deviation process, or whether the brand mark may be subcontracted. Three suppliers responded. Alpine Metals quotes $41.20 each, $3,800 tooling, six-week production after approval, freight collect, and 30 percent deposit; it silently prices drawing revision B. Meridian Works quotes $46.80, no tooling, eight weeks, delivered duty paid from Mexico, but excludes first-article inspection and assumes a substitute alloy. EastBridge Manufacturing quotes $32.50, $5,600 tooling, five weeks from China, free-on-board origin, with freight, duty, customs, insurance, and estimated four-week transit omitted. EastBridge's certificate is undated, its business address differs across two records, and it requests payment to an unrelated company. Alpine discloses that the buyer's project engineer previously worked for it; no conflict review is recorded. A currency worksheet converts one offer using a rate from seven months ago and applies the same three-percent duty to every country. Operations values earlier arrival at $2,000 per week, but this figure has no supporting calculation. The requester asks the coordinator to pick the cheapest option and issue a purchase order today to protect schedule. Learners must clarify requirements, build a defensible supplier field, control the RFQ, normalize total cost and risk, coordinate approval and delivery, and design performance records. They may not approve technical substitutions, clear trade or tax questions, verify suppliers beyond evidence, or create a commitment without delegated authority.

F01 · confirmedThe request is for 500 enclosures delivered to Provo in eleven weeks.
F02 · confirmedThe intake file omits seven requirement categories: alloy temper, coating standard, salt-spray expectation, inspection method, packaging, approved deviation process, and whether the brand mark may be subcontracted.
F03 · confirmedAlpine quotes $41.20 each, $3,800 tooling, and a thirty-percent deposit.
F04 · conflictingAlpine priced obsolete drawing revision B instead of requested revision C.
F05 · confirmedMeridian quotes $46.80 delivered duty paid and excludes first-article inspection.
F06 · provisionalMeridian assumes a substitute alloy not approved by engineering.
F07 · confirmedEastBridge quotes $32.50 and $5,600 tooling free-on-board origin.
F08 · unknownEastBridge freight, duty, customs, insurance, and transit risks are not priced.
F09 · conflictingEastBridge address records differ and its requested payee is an unrelated company.
F10 · confirmedAlpine has a prior-employment relationship with the buyer's project engineer.
F11 · confirmedThe currency rate is seven months old and a uniform duty assumption was applied.
F12 · provisionalOperations values earlier arrival at $2,000 per week without documented support.

EastBridge has the lowest quoted unit price but major landed-cost and identity evidence gaps.

Judgment required: Decide whether to seek clarification, hold, disqualify under policy, or retain as a contingent option.

Do not assume: Do not equate a low quote with lowest total cost, verified identity, or acceptable risk.

Schedule value may justify a higher price, but the $2,000 weekly figure is unsupported.

Judgment required: Identify who owns the business-impact estimate and what evidence is needed before using it in selection.

Do not assume: Do not invent schedule value to rationalize a preferred supplier.

Six module assignments and debriefs

Module 1 · Repair the intake

Bounded case starter

Turn the supplied request and seven explicitly missing requirement categories into an intake starter, clarification plan, and release-gate proposal without claiming approval.

Deliverable: A procurement-intake starter, clarification log, and requirement-release gate proposal with technical, quality, commercial, and logistics decisions pending.

Completion boundary: Complete a bounded starter and gap analysis using only CB01, F01, F02, F04, F06, F08, F11, and the assignment-scope record below. Populate supported fields, label every unavailable field “not supplied,” and cite the input ID for each material statement. You may design a proposed template, control, question, or decision rule, but must label it as a learner proposal rather than observed case evidence. Do not contact people, access live systems, run tests, sign records, claim approval, or invent names, dates, quotations, transactions, results, or source documents.

Workbook plan: 3 authored artifacts with 15 stable practice rows. The download includes a prerequisite check, six-to-eight task-specific operating steps, field-by-field guidance, completed supported and known-gap examples, supporting-artifact examples where authored, stop/go/escalate rules, and an exact completion test.

Review the module lesson →

Provided inputs

  • M01-I01 · case-fact · F01
    The request is for 500 enclosures delivered to Provo in eleven weeks.
  • M01-I02 · case-fact · F02
    The intake file omits seven requirement categories: alloy temper, coating standard, salt-spray expectation, inspection method, packaging, approved deviation process, and whether the brand mark may be subcontracted.
  • M01-I03 · case-fact · F04
    Alpine priced obsolete drawing revision B instead of requested revision C.
  • M01-I04 · case-fact · F06
    Meridian assumes a substitute alloy not approved by engineering.
  • M01-I05 · case-fact · F08
    EastBridge freight, duty, customs, insurance, and transit risks are not priced.
  • M01-I06 · case-fact · F11
    The currency rate is seven months old and a uniform duty assumption was applied.
  • M01-B01 · case-brief · CB01
    Use CB01, the full versioned case brief printed once at the start of this packet, as a citable narrative source for details not normalized into F01–F12. Preserve its uncertainty language and do not treat narrative detail as approval, complete operational records, or professional judgment.
  • M01-S01 · assignment-scope · F01, F02, F04, F06, F08, F11
    Build a starter version of “A procurement-intake starter, clarification log, and requirement-release gate proposal with technical, quality, commercial, and logistics decisions pending.” from the listed case facts. Treat requested structures, controls, questions, calculations, and templates as learner-designed proposals. Where an operational record or result is absent, add a gap entry naming the missing evidence and authorized owner instead of fabricating it.

Evidence criteria

  • M01-EC01: Uses CB01 and F01, F02, F04, F06, F08, and F11 to list each supplied or missing requirement category without inventing specifications
  • M01-EC02: Provides an authorized-owner field for each clarification without inventing names or completed decisions
  • M01-EC03: Blocks sourcing comparison until material scope is common and authorized release remains pending

Debrief lens: Comparable sourcing begins with a released requirement. Learners should not fill technical gaps themselves, because even a reasonable assumption can change price, quality, or compliance.

  • Owner-approved clarification log
  • Current requirement manifest
Module 2 · Screen the supplier field

Bounded case starter

Design a consistent supplier-screening matrix covering capability, conflict, identity, trade-review questions, capacity, and evidence; do not perform sanctions, trade, identity, or supplier verification.

Deliverable: A supplier-field starter, conflict-disclosure record, and verification-exception log with country-specific trade and sanctions results pending qualified review.

Completion boundary: Complete a bounded starter and gap analysis using only CB01, F03, F05, F07, F09, F10, and the assignment-scope record below. Populate supported fields, label every unavailable field “not supplied,” and cite the input ID for each material statement. You may design a proposed template, control, question, or decision rule, but must label it as a learner proposal rather than observed case evidence. Do not contact people, access live systems, run tests, sign records, claim approval, or invent names, dates, quotations, transactions, results, or source documents.

Workbook plan: 3 authored artifacts with 8 stable practice rows. The download includes a prerequisite check, six-to-eight task-specific operating steps, field-by-field guidance, completed supported and known-gap examples, supporting-artifact examples where authored, stop/go/escalate rules, and an exact completion test.

Review the module lesson →

Provided inputs

  • M02-I01 · case-fact · F03
    Alpine quotes $41.20 each, $3,800 tooling, and a thirty-percent deposit.
  • M02-I02 · case-fact · F05
    Meridian quotes $46.80 delivered duty paid and excludes first-article inspection.
  • M02-I03 · case-fact · F07
    EastBridge quotes $32.50 and $5,600 tooling free-on-board origin.
  • M02-I04 · case-fact · F09
    EastBridge address records differ and its requested payee is an unrelated company.
  • M02-I05 · case-fact · F10
    Alpine has a prior-employment relationship with the buyer's project engineer.
  • M02-B01 · case-brief · CB01
    Use CB01, the full versioned case brief printed once at the start of this packet, as a citable narrative source for details not normalized into F01–F12. Preserve its uncertainty language and do not treat narrative detail as approval, complete operational records, or professional judgment.
  • M02-S01 · assignment-scope · F03, F05, F07, F09, F10
    Build a starter version of “A supplier-field starter, conflict-disclosure record, and verification-exception log with country-specific trade and sanctions results pending qualified review.” from the listed case facts. Treat requested structures, controls, questions, calculations, and templates as learner-designed proposals. Where an operational record or result is absent, add a gap entry naming the missing evidence and authorized owner instead of fabricating it.

Evidence criteria

  • M02-EC01: Uses the same proposed criteria and a source-date field for all suppliers while preserving Mexico and China as CB01 origin facts
  • M02-EC02: Escalates the Alpine relationship through a proposed conflict procedure without claiming review
  • M02-EC03: Holds EastBridge payment and onboarding pending independent identity, trade, and payee verification
  • M02-EC04: Cites the supplied input IDs for material statements and marks omitted operational records or results “not supplied” rather than fabricating them

Debrief lens: Supplier screening should be consistent and evidence-based. A concern can justify a hold or escalation without claiming wrongdoing or certainty beyond the records.

  • Common supplier-screen rubric
  • Conflict and identity exception trail
Module 3 · Issue a controlled RFQ

Bounded case starter

Create a comparable revision-C package and answer material supplier questions consistently.

Deliverable: A draft RFQ manifest, bidder-communication template, and receipt-record template; no supplier acknowledgment or signed receipt is represented as supplied.

Completion boundary: Complete a bounded starter and gap analysis using only CB01, F01, F02, F04, F06, F08, and the assignment-scope record below. Populate supported fields, label every unavailable field “not supplied,” and cite the input ID for each material statement. You may design a proposed template, control, question, or decision rule, but must label it as a learner proposal rather than observed case evidence. Do not contact people, access live systems, run tests, sign records, claim approval, or invent names, dates, quotations, transactions, results, or source documents.

Workbook plan: 3 authored artifacts with 12 stable practice rows. The download includes a prerequisite check, six-to-eight task-specific operating steps, field-by-field guidance, completed supported and known-gap examples, supporting-artifact examples where authored, stop/go/escalate rules, and an exact completion test.

Review the module lesson →

Provided inputs

  • M03-I01 · case-fact · F01
    The request is for 500 enclosures delivered to Provo in eleven weeks.
  • M03-I02 · case-fact · F02
    The intake file omits seven requirement categories: alloy temper, coating standard, salt-spray expectation, inspection method, packaging, approved deviation process, and whether the brand mark may be subcontracted.
  • M03-I03 · case-fact · F04
    Alpine priced obsolete drawing revision B instead of requested revision C.
  • M03-I04 · case-fact · F06
    Meridian assumes a substitute alloy not approved by engineering.
  • M03-I05 · case-fact · F08
    EastBridge freight, duty, customs, insurance, and transit risks are not priced.
  • M03-B01 · case-brief · CB01
    Use CB01, the full versioned case brief printed once at the start of this packet, as a citable narrative source for details not normalized into F01–F12. Preserve its uncertainty language and do not treat narrative detail as approval, complete operational records, or professional judgment.
  • M03-S01 · assignment-scope · F01, F02, F04, F06, F08
    Build a starter version of “A draft RFQ manifest, bidder-communication template, and receipt-record template; no supplier acknowledgment or signed receipt is represented as supplied.” from the listed case facts. Treat requested structures, controls, questions, calculations, and templates as learner-designed proposals. Where an operational record or result is absent, add a gap entry naming the missing evidence and authorized owner instead of fabricating it.

Evidence criteria

  • M03-EC01: Includes drawing, quantity, delivery, quality, packaging, commercial, and deviation requirements
  • M03-EC02: Versions and distributes material clarifications to the applicable supplier field
  • M03-EC03: Separates supplier acknowledgment from technical acceptance
  • M03-EC04: Cites the supplied input IDs for material statements and marks omitted operational records or results “not supplied” rather than fabricating them

Debrief lens: The RFQ should make each bidder respond to the same active package. Material answers require controlled distribution so speed or private access does not distort comparability.

  • Versioned RFQ manifest
  • Consistent bidder communication record
Module 4 · Normalize total cost

Bounded case starter

Compare scope, tooling, terms, freight, duty, transit, quality, and schedule without false precision.

Deliverable: A landed-cost worksheet starter with low-base-high ranges, source-note fields, and explicit gaps for a current currency rate, duty treatment, freight, insurance, customs, and transit evidence.

Completion boundary: Complete a bounded starter and gap analysis using only CB01, F03, F04, F05, F06, F07, F08, F11, F12, and the assignment-scope record below. Populate supported fields, label every unavailable field “not supplied,” and cite the input ID for each material statement. You may design a proposed template, control, question, or decision rule, but must label it as a learner proposal rather than observed case evidence. Do not contact people, access live systems, run tests, sign records, claim approval, or invent names, dates, quotations, transactions, results, or source documents.

Workbook plan: 2 authored artifacts with 11 stable practice rows. The download includes a prerequisite check, six-to-eight task-specific operating steps, field-by-field guidance, completed supported and known-gap examples, supporting-artifact examples where authored, stop/go/escalate rules, and an exact completion test.

Review the module lesson →

Provided inputs

  • M04-I01 · case-fact · F03
    Alpine quotes $41.20 each, $3,800 tooling, and a thirty-percent deposit.
  • M04-I02 · case-fact · F04
    Alpine priced obsolete drawing revision B instead of requested revision C.
  • M04-I03 · case-fact · F05
    Meridian quotes $46.80 delivered duty paid and excludes first-article inspection.
  • M04-I04 · case-fact · F06
    Meridian assumes a substitute alloy not approved by engineering.
  • M04-I05 · case-fact · F07
    EastBridge quotes $32.50 and $5,600 tooling free-on-board origin.
  • M04-I06 · case-fact · F08
    EastBridge freight, duty, customs, insurance, and transit risks are not priced.
  • M04-I07 · case-fact · F11
    The currency rate is seven months old and a uniform duty assumption was applied.
  • M04-I08 · case-fact · F12
    Operations values earlier arrival at $2,000 per week without documented support.
  • M04-B01 · case-brief · CB01
    Use CB01, the full versioned case brief printed once at the start of this packet, as a citable narrative source for details not normalized into F01–F12. Preserve its uncertainty language and do not treat narrative detail as approval, complete operational records, or professional judgment.
  • M04-S01 · assignment-scope · F03, F04, F05, F06, F07, F08, F11, F12
    Build a starter version of “A landed-cost worksheet starter with low-base-high ranges, source-note fields, and explicit gaps for a current currency rate, duty treatment, freight, insurance, customs, and transit evidence.” from the listed case facts. Treat requested structures, controls, questions, calculations, and templates as learner-designed proposals. Where an operational record or result is absent, add a gap entry naming the missing evidence and authorized owner instead of fabricating it.

Evidence criteria

  • M04-EC01: Corrects known revision and scope differences before any proposed ranking
  • M04-EC02: Requires a current sourced currency rate and qualified duty or import review while leaving both unavailable in the packet
  • M04-EC03: Keeps unsupported schedule value and unknown logistics visibly uncertain
  • M04-EC04: Cites the supplied input IDs for material statements and marks omitted operational records or results “not supplied” rather than fabricating them

Debrief lens: Ranges are appropriate when freight, duty, transit, or schedule value remains uncertain. The worksheet should reveal which unknown could change the ranking.

  • Sourced cost normalization
  • Sensitivity and decision-breakpoint analysis
Module 5 · Control commitment and delivery

Bounded case starter

Design approval, purchase-order release, first article, change, shipment, and receipt controls.

Deliverable: An approval matrix, draft purchase order, milestone tracker, and exception path.

Completion boundary: Complete a bounded starter and gap analysis using only CB01, F01, F03, F05, F06, F07, F09, and the assignment-scope record below. Populate supported fields, label every unavailable field “not supplied,” and cite the input ID for each material statement. You may design a proposed template, control, question, or decision rule, but must label it as a learner proposal rather than observed case evidence. Do not contact people, access live systems, run tests, sign records, claim approval, or invent names, dates, quotations, transactions, results, or source documents.

Workbook plan: 4 authored artifacts with 12 stable practice rows. The download includes a prerequisite check, six-to-eight task-specific operating steps, field-by-field guidance, completed supported and known-gap examples, supporting-artifact examples where authored, stop/go/escalate rules, and an exact completion test.

Review the module lesson →

Provided inputs

  • M05-I01 · case-fact · F01
    The request is for 500 enclosures delivered to Provo in eleven weeks.
  • M05-I02 · case-fact · F03
    Alpine quotes $41.20 each, $3,800 tooling, and a thirty-percent deposit.
  • M05-I03 · case-fact · F05
    Meridian quotes $46.80 delivered duty paid and excludes first-article inspection.
  • M05-I04 · case-fact · F06
    Meridian assumes a substitute alloy not approved by engineering.
  • M05-I05 · case-fact · F07
    EastBridge quotes $32.50 and $5,600 tooling free-on-board origin.
  • M05-I06 · case-fact · F09
    EastBridge address records differ and its requested payee is an unrelated company.
  • M05-B01 · case-brief · CB01
    Use CB01, the full versioned case brief printed once at the start of this packet, as a citable narrative source for details not normalized into F01–F12. Preserve its uncertainty language and do not treat narrative detail as approval, complete operational records, or professional judgment.
  • M05-S01 · assignment-scope · F01, F03, F05, F06, F07, F09
    Build a starter version of “An approval matrix, draft purchase order, milestone tracker, and exception path.” from the listed case facts. Treat requested structures, controls, questions, calculations, and templates as learner-designed proposals. Where an operational record or result is absent, add a gap entry naming the missing evidence and authorized owner instead of fabricating it.

Evidence criteria

  • M05-EC01: Requires delegated approval before supplier commitment
  • M05-EC02: Places technical approval before substitute material or first-article acceptance
  • M05-EC03: Defines delivery evidence, change control, payment gates, and receipt ownership
  • M05-EC04: Cites the supplied input IDs for material statements and marks omitted operational records or results “not supplied” rather than fabricating them

Debrief lens: A selection recommendation is not a purchase commitment. The controlled process preserves authority, technical acceptance, change approval, payment evidence, and delivery accountability.

  • Delegated approval record
  • Milestone and exception controls
Module 6 · Measure supplier performance

Bounded case starter

Create fair, reproducible records for delivery, quality, responsiveness, cost, and control failures.

Deliverable: A supplier scorecard dictionary and monthly review template.

Completion boundary: Complete a bounded starter and gap analysis using only CB01, F04, F06, F09, F10, F12, and the assignment-scope record below. Populate supported fields, label every unavailable field “not supplied,” and cite the input ID for each material statement. You may design a proposed template, control, question, or decision rule, but must label it as a learner proposal rather than observed case evidence. Do not contact people, access live systems, run tests, sign records, claim approval, or invent names, dates, quotations, transactions, results, or source documents.

Workbook plan: 2 authored artifacts with 9 stable practice rows. The download includes a prerequisite check, six-to-eight task-specific operating steps, field-by-field guidance, completed supported and known-gap examples, supporting-artifact examples where authored, stop/go/escalate rules, and an exact completion test.

Review the module lesson →

Provided inputs

  • M06-I01 · case-fact · F04
    Alpine priced obsolete drawing revision B instead of requested revision C.
  • M06-I02 · case-fact · F06
    Meridian assumes a substitute alloy not approved by engineering.
  • M06-I03 · case-fact · F09
    EastBridge address records differ and its requested payee is an unrelated company.
  • M06-I04 · case-fact · F10
    Alpine has a prior-employment relationship with the buyer's project engineer.
  • M06-I05 · case-fact · F12
    Operations values earlier arrival at $2,000 per week without documented support.
  • M06-B01 · case-brief · CB01
    Use CB01, the full versioned case brief printed once at the start of this packet, as a citable narrative source for details not normalized into F01–F12. Preserve its uncertainty language and do not treat narrative detail as approval, complete operational records, or professional judgment.
  • M06-S01 · assignment-scope · F04, F06, F09, F10, F12
    Build a starter version of “A supplier scorecard dictionary and monthly review template.” from the listed case facts. Treat requested structures, controls, questions, calculations, and templates as learner-designed proposals. Where an operational record or result is absent, add a gap entry naming the missing evidence and authorized owner instead of fabricating it.

Evidence criteria

  • M06-EC01: Defines denominator, cause, period, exclusion, source, owner, and threshold
  • M06-EC02: Separates buyer-caused changes from supplier-attributable performance
  • M06-EC03: Displays severe identity, ethics, or quality events outside averaged scores
  • M06-EC04: Cites the supplied input IDs for material statements and marks omitted operational records or results “not supplied” rather than fabricating them

Debrief lens: Scorecards should distinguish attributable events and retain severe concerns. A single blended grade can conceal quality or integrity risks that need independent action.

  • Reproducible metric definitions
  • Severe-event and corrective-action visibility

Self-review standard

Inspect evidence, reasoning, completeness, boundaries, and traceability.

There is no single universal supplier selection. Strong work compares common scope, exposes uncertainty and conflicts, and reserves technical, trade, legal, and commitment authority for qualified owners. The downloadable rubric is formative guidance only—not a grade, verified completion, credential assessment, or professional approval.

Material substitution, tolerance, coating, inspection, first article, product safety, or technical acceptance

Route to: Authorized engineer, quality owner, and applicable product or regulatory specialist

Learner boundary: The coordinator routes and records the decision but does not approve technical equivalence.

Trade, tariff, customs, tax, sanctions, supplier identity, conflict, contract, insurance, or payment-change concern

Route to: Qualified trade, tax, legal, compliance, finance, and supplier-risk owners

Learner boundary: The case does not verify eligibility, duty, legality, identity, or contract acceptability.

05 Editable working tool

Use the template.
Inspect the example.

Use one row per normalized factor. Preserve the supplier's original quote separately, cite the source or formula for every adjustment, and label unknowns instead of filling them with guesses. Add as many rows as needed, export a CSV, or print only this tool. Entries are not transmitted. They last only in this tab unless you opt into device-only saving in the learning-work panel. No account or cross-device sync is provided.

Editable Procurement Coordination public-foundation worksheet
Comparison factorSupplier ASupplier BSupplier CRisk or clarification

Completed example

Comparison factor
Expected landed cost for 5,000 units delivered to Provo, Utah, based on RFQ revision 3
Supplier A
$68,400; DDP Provo; tooling included; 45-day lead time
Supplier B
$61,500 unit-price extension plus $6,800 tooling and freight not quoted; FCA Monterrey; 35-day production estimate
Supplier C
$71,200; DAP Salt Lake City; tooling included; customs clearance and duty excluded; 55-day lead time
Risk or clarification
Confirm classification, duty, insurance, and final-mile estimates with qualified trade/logistics owners before recommendation; Supplier B is not yet comparable.

Data boundary: Work only in an approved system. Do not place passwords, payment-card data, government identifiers, health information, export-controlled material, client secrets, or unpublished invention details in this public worksheet.

Practice one module.
Get useful feedback now.

Each two-question check works independently. Review any answered question immediately; you do not need to finish all twelve. Feedback is formative, not a verified grade or credential.

Module 1 · 2-item formative check

Procurement intake and requirement clarity

Choose an answer and request feedback. Read why each option does or does not fit the evidence. Answers stay in this tab unless you choose device-only saving; they are never submitted.

Question 1 of 2 · MODULE 1 · knowledgeA supplier proposes an unlisted substitute material during intake. What should the procurement coordinator do first?
Question 2 of 2 · MODULE 1 · scenarioHow should SummitArc treat the incomplete requirement baseline before releasing an enclosure RFQ?

Answer either question to review its reasoning.

Module 2 · 2-item formative check

Supplier field and conflict boundaries

Choose an answer and request feedback. Read why each option does or does not fit the evidence. Answers stay in this tab unless you choose device-only saving; they are never submitted.

Question 1 of 2 · MODULE 2 · knowledgeA project engineer previously worked for one bidder. Which action best protects the supplier-screening decision?
Question 2 of 2 · MODULE 2 · scenarioWhich supplier-screening finding is specific enough for an owner to correct and a reviewer to retest?

Answer either question to review its reasoning.

Module 3 · 2-item formative check

RFQ package and communication

Choose an answer and request feedback. Read why each option does or does not fit the evidence. Answers stay in this tab unless you choose device-only saving; they are never submitted.

Question 1 of 2 · MODULE 3 · knowledgeHow should a material clarification be handled while several suppliers are preparing responses to one RFQ?
Question 2 of 2 · MODULE 3 · scenarioWhich evidence package gives an independent reviewer a reliable Module 3 RFQ audit trail?

Answer either question to review its reasoning.

Module 4 · 2-item formative check

Quotation normalization and total cost

Choose an answer and request feedback. Read why each option does or does not fit the evidence. Answers stay in this tab unless you choose device-only saving; they are never submitted.

Question 1 of 2 · MODULE 4 · knowledgeWhich comparison provides the most defensible basis for evaluating total expected procurement cost?
Question 2 of 2 · MODULE 4 · scenarioHow should SummitArc compare EastBridge while key logistics costs remain absent from the quotation?

Answer either question to review its reasoning.

Module 5 · 2-item formative check

Approval, PO, and delivery coordination

Choose an answer and request feedback. Read why each option does or does not fit the evidence. Answers stay in this tab unless you choose device-only saving; they are never submitted.

Question 1 of 2 · MODULE 5 · knowledgeWhen does a supplier quotation become an authorized purchase commitment in this workflow?
Question 2 of 2 · MODULE 5 · scenarioWhat may the coordinator responsibly complete before SummitArc authorizes any supplier commitment?

Answer either question to review its reasoning.

Module 6 · 2-item formative check

Performance records and continuous improvement

Choose an answer and request feedback. Read why each option does or does not fit the evidence. Answers stay in this tab unless you choose device-only saving; they are never submitted.

Question 1 of 2 · MODULE 6 · knowledgeWhat makes a supplier-performance metric suitable for an authorized sourcing or development decision?
Question 2 of 2 · MODULE 6 · scenarioHow should SummitArc incorporate the supplied issues into a new supplier scorecard without rewriting history?

Answer either question to review its reasoning.

07 Sources and handoffs

Verify the standard.
Know when to escalate.

Module provenance distinguishes external authorities, legal-status evidence, and Wealth Synergy internal operating standards. Requirements change; verify current source text and obtain qualified advice when a decision carries legal, financial, technical, employment, safety, or regulatory consequences.

icc-incoterms-rules · Official guidance

ICC Incoterms rules

Primary publisher overview of the rules used to allocate specified delivery tasks, costs, and risks in sales contracts.

Open reviewed external source ↗

cbp-importer-exporter-tips · Official guidance

U.S. Customs and Border Protection — Tips for New Importers and Exporters

Current official orientation to CBP policies, procedures, import requirements, classification, entry, restrictions, and other starting points; use qualified customs advice for a particular decision.

Open reviewed external source ↗

far-part-3 · Current codified text

Federal Acquisition Regulation Part 3 — Improper Business Practices and Personal Conflicts of Interest

Official federal procurement rules illustrating integrity and conflict controls; private organizations must follow their own applicable policy and law.

Open reviewed external source ↗

nist-sp-800-161-r1 · Official guidance

NIST SP 800-161 Rev. 1 — Cybersecurity Supply Chain Risk Management Practices

Authoritative risk-management guidance for supply-chain cybersecurity, useful when suppliers handle systems, software, or sensitive information.

Open reviewed external source ↗

ws-procurement-operating-standard · Academy internal operating standard

Wealth Synergy procurement coordination internal operating standard

Academy-selected intake, bidder fairness, quotation, approval, purchase, evidence, and supplier-review controls. This is an internal operating standard selected by Foundry Academy; it is not law, accreditation, licensure, or an external-standard requirement.

Version 1.0 · reviewed 2026-09-01 · owner: Foundry Academy curriculum owner

Future facilitated pathway · not open

Practice with feedback.
Finish with evidence.

The public case lab is available now. A future facilitated cohort may add assignments, feedback, and human capstone review only after a named qualified facilitator and reviewer, schedule, rubric, privacy controls, support, price, refund terms, and delivery terms are published in writing. No enrollment or payment is accepted here.

Clear boundaries.

Course material supports professional development. It does not replace legal, tax, accounting, cybersecurity, engineering, regulatory, employment, translation, or other qualified professional advice where that expertise is required.

The public knowledge check and portal review markers are learning aids only. They do not award a credential. Pilot curriculum and credential assessment are in quality review; Foundry Academy is not currently representing these pages as accredited instruction or an automatic path to a certificate.

Participation does not guarantee employment, client work, funding, licensure, certification by a public authority, or any business outcome.

Use the public foundation

Read. Practice.
Inspect your evidence.

All public materials and case files are available without enrollment. A fit conversation is non-binding and does not reserve a place in a future pilot.

Ask about this track