02 · Compare the artifacts
Supported work. Visible uncertainty.
This is a fictional, sanitized training case using fabricated organizations and contacts. It contains no real personal or confidential data and is not legal, privacy, employment, or sales-results advice.
ClearBench ethical outbound pilot
ClearBench is a fictional supplier of modular quality-inspection workstations for small manufacturers. Leadership wants a four-week outbound pilot aimed at 120 companies in Utah and neighboring states. The proposed ideal-customer profile is plants with 25 to 250 employees, repeat inspection work, and a recent expansion, quality issue, or hiring signal. Research confirms 74 accounts meet all three fit indicators, 28 meet two, and 18 have no traceable trigger beyond industry. The list contains 162 contacts: 46 quality leaders, 39 operations leaders, 31 owners, 22 procurement contacts, and 24 people whose role is unclear. Twelve contacts left their listed employer, eight have explicit prior opt-outs, and 19 personal mobile numbers came from an unapproved list vendor. A draft email states that ClearBench will cut inspection time 40 percent, but the only evidence is one internal demonstration showing a 17 percent reduction under controlled conditions. The sequence proposes six emails, four calls, and two text messages over 14 days. It lacks channel-specific consent review, weekend restrictions, reply handling, and a stop condition after referral to another contact. Sales considers a meeting qualified whenever a prospect accepts a calendar invitation. Delivery specialists want a written problem, current process, stakeholder, urgency, and agreed next step before handoff. The pilot budget is $6,000, capacity is eight discovery calls per week, and only two specialists can conduct technical discovery. Learners must build a responsible account field, role research method, evidence-based message, controlled cadence, qualification handoff, and learning scorecard. The exercise does not promise response rates, revenue, or regulatory compliance; applicable outreach rules require qualified review.
Supported example — reference only
- Milestone or date
- Day 1 preflight — proposed
- Deliverable
- Run suppression and contact-source review before any proposed first touch.
- Evidence
- M04-I01 (F05, confirmed: eight prior opt-outs); M04-I04 (F09, confirmed: control gaps)
- Owner
- Sales process owner and authorized legal or privacy reviewer
- Dependency
- Record identities, suppression output, permitted channel, timing policy, and reviewer decision: not supplied.
- Review gate
- Every selected record must clear current suppression, source, channel, and contact-state controls.
- Exception
- Any opt-out, reply, referral, wrong contact, disqualification, or accepted handoff stops the sequence.
- Status
- Learner proposal — not activated
A well-handled evidence gap
- Milestone or date
- Text-message gate — date not supplied
- Deliverable
- Determine whether any text channel is permitted before including it in a cadence.
- Evidence
- M04-I02 (F06, confirmed: nineteen personal mobile numbers from an unapproved vendor)
- Owner
- Authorized legal or privacy reviewer and Sales process owner
- Dependency
- Affected records, approved source, channel permission, jurisdiction, consent evidence, policy, and review result: not supplied.
- Review gate
- Qualified reviewer documents permission and approved source before any text can be proposed for activation.
- Exception
- Quarantine unapproved mobile data; do not test or contact the number.
- Status
- Blocked — channel review required
Flawed approach — do not copy
Marking this fourteen-day cadence map “approved and complete” without the required evidence or reviewer is a flawed submission. Stop activation when suppression, source approval, channel permission, timing, reply handling, referral stop, wrong-contact handling, or owner is missing.
Repair: Rework the fourteen-day cadence map as an evidence-backed draft, not an approved result. Capture the proposed touch count, opt-out condition, unsupported mobile-source condition, and missing cadence controls with exact module input IDs. Map fourteen calendar days as a learner proposal, leaving exact send times and channel permissions pending. Add state-based stops for opt-out, reply, referral, disqualification, wrong contact, and accepted handoff before scheduling any touch. Check the revision against this requirement: The cadence represents fourteen days and supplied touch counts without treating timing or activation as approved. If the required evidence is still absent, keep the decision blocked and identify the missing input or authorized reviewer.
Full case record, ambiguities and all assignments →